9 thoughts on “Library Proposes Estimated $2 Million Renovation of 1913 Building, New Uses Include Additional Meeting and Event Space”

  1. Like hell. We have already spent 2.5 million to move it 100 feet for nothing. Now, it’s just an eye sore. Don’t waste another penny on something that we should have knock down in the first place. I’m sick in tired of the tree huggers in this town getting there way, when an overwhelming number of us want don’t want to waste the money trying to save every scrappy old building in town. If you think I’m kidding, I dare you to put it to a vote.

  2. Not a single tax dollar should go towards this project. The renovation costs cited to build a meeting space are absurd.

  3. So, first they were determined to scrape the 1913 Library and put in a “lawn” because they said they need all that outdoor space for all the outdoor events they’ll be having. Then, when they’re rebuffed they instead spend a fortune to move the 1913 Library building for all this much-needed outdoor event space. THEN they tore out the guts of the building, molding, original flooring, mural, left windows open (yup, there are photos) and finally boarded it up with posters over the windows. NOW they want people to cough up more money to “renovate” what they destroyed. There will be some more naming opportunities though so someone will get their name on it.

    I know this will never be published but just had to try.

    Search on 1913 New Canaan Library – dozens of articles, videos, photos, and prob hundreds of hours of Town Hall meeting from about 2021 to 2024.

  4. As a New Canaan Library trustee, I’m excited about plans to bring our historic 1913 building back to life as a flexible space for the community. Patrons told us they need more meeting space and later hours, and the renovation would let us host up to 90 people and stay open later.

    Our library brings our town together, from preschoolers discovering books to neighbors learning new skills. Thanks to the Town’s $1 million grant, we’re off to a strong start, and we’re pursuing additional funding to complete the project. We’re fortunate to have a community that shows up for its library.

  5. I am confident that our community will be as excited as our board of trustees to see these thoughtful plans through. The town has spoken through the community needs assessment and reaffirmed a need for more flexible meeting space. We look forward to the adaptive rehabilitation of the 1913 legacy building!

  6. It would be great if it could be a quiet work space. There really is no place in the main library that is quiet! The top floor gets pretty noisy at times.

  7. This proposal doesn’t seem thoughtful, at all. The space is long and narrow, akin to three bowling alleys side-by-side — ill-suited for events and public speaking. Mostly sitting empty and unused, except for special events which would have to scale to the small space, it will need to be continuously heated. At $1500/sq.ft., the renovation far exceeds reasonable market costs, which leads me to believe that either the structure is not amenable to renovation or that the town is being fleeced, or both.

    We had to pull teeth to get the planetarium done (which is fabulous, by the way). There must be a better use for $1M of public money. If not, give it back.

  8. $1 Million grant — wow –did you know they spent 1.4 million to buy the
    2 family house valued at $750K next to the gas station — and who owned that house –former President of the Library. At that time the town gave money to get the deal done. This seems to be very expensive project for the square footages. But I guess what else can they do with this empty building.
    And why didn’t they buy the gas stations when it went on the market.
    would have had the whole block. More open space.
    It certainly doesn’t look like the artist rendering with all the open space.
    Especially with the sidewalk in the middle.

Leave a Reply

Your email address will not be published. Required fields are marked *