Around Town
SLIDESHOW: Walking the New ‘GreenLink’ Trail and ‘Greenway’ Loop in New Canaan
|
The “GreenLink Trail” to open at 11:30 a.m. Sunday in New Canaan—on Earth Day, as part of the New Canaan Land Trust’s plans—creates a new, walk-able loop that advocates have been dreaming about, as well as carefully planning, for some four years. It features an attractive, footbridge-laden trail that spans wetlands off of Weed Street, and ultimately helps connect Irwin Park to the New Canaan Nature Center. That trail is the final piece of a larger, pedestrian-friendly loop that runs from downtown New Canaan, up Elm, along Weed Street and into Irwin, then back along Weed and into the woods, across a conservation easement and onto Land Trust property, then into the Nature Center’s woods, up onto Oenoke Ridge and past God’s Acre into downtown New Canaan again. The captioned slideshow above tracks my hike of the trail and that larger loop on Wednesday, with our dogs Louis, Marvin and Dexter. A few fast facts on it (time and distance can be tailored):
2.2 miles
5,656 steps
50 minutes
The hike can vary from two to three-plus miles, depending on just where you want to start downtown and whether you choose to enjoy additional trails within the Nature Center.